Learners are required to complete a multiple choice test.
Goal Path: Études postsecondaires, Études secondaires
Date Added: 27 Février 2013
Tags:
Learners are required to complete a multiple choice test.
Goal Path: Études postsecondaires, Études secondaires
Date Added: 27 Février 2013
Tags:
The task involves the learner understanding a budget.
Goal Path: Autonomie
Date Added: 16 Avril 2013
Tags:
Calculate the cost of a Group Golf Package and create a schedule of tee times.
Goal Path: Emploi, Études postsecondaires, Études secondaires
Date Added: 17 Juillet 2013
Tags:
Calculate the change to receive after making a cash purchase.
Try this digitized, interactive version: http://www.quillnetwork.com/csc/C1.1-CalculateChangefromaPurchase/index.html
Goal Path: Emploi
Date Added: 14 Janvier 2015
Tags:
Calculate and convert units of measure.
Goal Path: Emploi, Formation en apprentissage
Date Added: 11 Avril 2014
Tags:
Understand how to calculate materials and costs for creating a flower bed.
Goal Path: Emploi, Études postsecondaires, Études secondaires, Autonomie
Date Added: 17 Juillet 2013
Tags:
The learner will use a club list and a driver sign-up sheet to calculate the number of cars needed to drive a group of children to a track and field event.
Try this digitized, interactive version...
Goal Path: Emploi, Autonomie
Date Added: 14 Janvier 2015
Tags:
Calculate the travel time from departure to arrival.
Try this digitized, interactive version: http://www.quillnetwork.com/csc/C2.1-CalculateTravelTime/index.html
Goal Path: Autonomie
Date Added: 14 Janvier 2015
Tags:
Carpenters calculate volumes of window sills, thrust blocks and columns to determine the amount of concrete required.
*Tasks 1, 3, & 4 ‘C3’ tasks are higher than Level 3 OALCF
*Task 3 has been...
Goal Path: Emploi, Formation en apprentissage
Date Added: 11 Avril 2014
Tags: